Verterra Projects.
Discover our demonstrated experience.
From Failure to Function: Restoring Vegetation on Tailings Dams
Revegetation of mine tailings often relies on a thin soil cover to support vegetation growth. However, these tailings can be chemically and physically hostile to plants—especially when the depth of the cover soil is limited due to resource constraints. Poor vegetation establishment in these areas increases erosion risk and presents ongoing environmental and regulatory challenges, so when revegetation persistently fails, an in depth investigation is required.
Major Integrated Project: “Wet Tropics People – Setting the Course for the Reef.”
The project focussed specifically on improving water quality from cane and banana farms in the Tully and Johnstone River Catchments.
Mt Wickham Gully Rehabilitation
Innovative Design and operational delivery over two phases of alluvial gully rehabilitation at th Mt Wickham property, 38km WNW of Collinsville aimed at erosion control, and water quality improvements from significant reduction of fine sediment loss to regional waterways that directly impact the Great Barrier Reef Lagoon with ecosystem stresses, including to inshore reef and seagrass beds.