Verterra Projects

Discover our on-ground expertise in project design and delivery.

Logan Creek Streambank Rehabilitation

This project rehabilitated severely eroded streambanks along Logan Creek following extreme rainfall and flooding in the 2021–22 severe weather season. The collapse of streambanks had caused loss of valuable riparian vegetation and was adversely impacting aquatic habitat and water quality downstream. Funded jointly by the Queensland and Australian Governments under the Disaster Recovery Funding Arrangements (DRFA), the project aimed to stabilise riparian areas, restore ecological function and improve catchment resilience to future flood events.

Read More

Gully Rehabilitation for Envomark Reef Credits

For this ReVert Landscape Rehabilitation project Verterra was engaged to rehabilitate a large, actively eroding gully system adjacent to the Bowen River in North Queensland. Delivered in partnership with Alluvium through the Landscape Restoration Partnership, this project represents Australia’s first gully rehabilitation initiative registered under the ENVOMARK Reef Credit Methodology - establishing a benchmark for large-scale sediment reduction projects designed to improve water quality flowing to the Great Barrier Reef.

Read More
Mining & Energy, VerterraPROVE Susan Horn Mining & Energy, VerterraPROVE Susan Horn

Enabling Low-Impact Pumped Hydro with Soil and Erosion Insights

Pumped hydro energy storage is gaining momentum as a critical component of Australia’s renewable energy transition. While environmentally beneficial in operation, their development requires significant infrastructure—such as roads, pipelines, and reservoirs—that can impact soil health, increase erosion risk, and reduce land suitability for agriculture. This case study demonstrates how Verterra approaches risk assessment for these projects.

Read More

Reef Water Quality in Agriculture Developments

Objectives of this project include delivery of a South Yaamba Reef Water Quality Precinct Plan to provide support to the South Yaamba area and to selected landholders in the broader Fitzroy Food Bowl who are progressing irrigation developments on their land to achieve reef water quality outcomes (reduce sediment, pesticide, and nutrient export).

Read More

Mt Wickham Gully Rehabilitation

Innovative Design and operational delivery over two phases of alluvial gully rehabilitation at th Mt Wickham property, 38km WNW of Collinsville aimed at erosion control, and water quality improvements from significant reduction of fine sediment loss to regional waterways that directly impact the Great Barrier Reef Lagoon with ecosystem stresses, including to inshore reef and seagrass beds.

Read More

Burnett-Mary Horticulture 1-on-1 Delivering Tailored Solutions

Verterra engaged with 60 horticultural growers (macadamia, avocado, sweet potato) in the Burnett-Mary Horticultural region, providing growers with detailed farm mapping (EM), soil analysis and agronomic advice designed to promote best outcomes in nutrient management and soil health for increased farm productivity.

Read More