Landscape Restoration, Delivered with Certainty
A partnership between Alluvium Consulting and Verterra Ecological Engineering to design and deliver large-scale gully and streambank restoration projects that perform.
The Landscape Restoration Partnership (LRP) brings together leading expertise in catchment science, geomorphology and ecological engineering to solve one of Australia’s most persistent environmental challenges - erosion.
Focused on gully and streambank rehabilitation, LRP delivers end-to-end projects that stabilise landscapes, reduce sediment loss, and restore long-term ecological function across catchments.
From Design to Delivery - without the disconnect
Too often, restoration projects fail at the interface between design and implementation.
Designs that are scientifically sound but not practical to build
Construction that deviates from intent
Outcomes that don’t hold up under real-world conditions
The Landscape Restoration Partnership was created to solve this.
By integrating design, verification and on-ground delivery into a single model, LRP ensures that what is designed is what gets built—and what gets built performs.
Meet the Partners
DESIGN & CATCHMENT SCIENCE
Alluvium Consulting are leaders in geomorphology, hydrology and catchment-scale planning. As specialists in erosion processes, sediment dynamics and river systems Alluvium is responsible for:
Site assessment and prioritisation
Concept and detailed design
Hydraulic and geomorphic modelling
Technical oversight and site inspections
DELIVERY & ECOLOGICAL ENGINEERING
Verterra Ecological Engineering are experts in translating design into functional landscapes. As specialists in soil systems, revegetation and landscape stabilisation Verterra is responsible for:
Construction & implementation
Soil amelioration and growth media systems
Vegetation establishment
Performance monitoring and verification
Targeted Solutions for Gully & Streambank Erosion
A Proven Delivery Model
The Landscape Restoration Partnership focuses on high-impact erosion processes that drive sediment loss and degrade waterways. Our process delivers reductions in sediment load enerting waterways and sensitive ecosystems across Australia.
Identify & Prioritise
Catchment analysis to locate high-impact erosion areas.
Design for Performance
Science-based & site-specific restoration design.
Verify Outcomes
Monitoring to confirm stability & sediment reduction.
Deliver On-Ground
Construction & implementation aligned to design intent.
Confidence from Concept to Completion
-
No gaps between concept and construction - reducing risk and rework.
-
Combined expertise in catchment science and practical delivery.
-
Projects designed to achieve measurable sediment reduction and long-term stability.
-
From single sites to large regional programs.
-
Supports programs targeting water quality outcomes and sediment reduction.
Who We Work With
Restore Function. Reduce Risk. Deliver Results.
If you’re planning or funding erosion control or landscape restoration, the Landscape Restoration Partnership provides a proven pathway from concept to performance.